FIG.02 / FRASER RIVER · BC

2024Fraser River · BC
Northern Corridor Power Link
800m crossing · basalt formation
High-capacity transmission conduits installed beneath a salmon-bearing river with zero surface disruption.
A small sample of what an aligned team and an instrumented fleet can deliver in difficult conditions.

High-capacity transmission conduits installed beneath a salmon-bearing river with zero surface disruption.

Engineered route through muskeg and boreal forest delivering product line under environmentally protected zones.

Dense downtown fiber buildout completed across 18 city blocks with negligible street disruption.