03 · Field record

Selected deployments.

A small sample of what an aligned team and an instrumented fleet can deliver in difficult conditions.

FIG.02 / FRASER RIVER · BC
Northern Corridor Power Link
2024Fraser River · BC

Northern Corridor Power Link

800m crossing · basalt formation

High-capacity transmission conduits installed beneath a salmon-bearing river with zero surface disruption.

FIG.04 / NORTHERN ALBERTA
Boreal Pipeline Corridor
2024Northern Alberta

Boreal Pipeline Corridor

42km · multi-stage HDD

Engineered route through muskeg and boreal forest delivering product line under environmentally protected zones.

FIG.05 / VANCOUVER · BC
Urban Fiber Backbone
2023Vancouver · BC

Urban Fiber Backbone

12.4km · micro-trenching + HDD

Dense downtown fiber buildout completed across 18 city blocks with negligible street disruption.